Weekly Reports of Project 2019-2020 ITC571

Weekly Progress Report – Value: 15%

Full Name Vijaykumar Veldi
Student ID 11683295
Subject ITC571 – Emerging Technology and Innovations
Assignment No Weekly Progress Report
Due Date 07-Feb- 2020
Lecturer’s Name Malka N. Halgamuge

 

Web link of your blog/website: http://thinkspace.csu.edu.au/

http// thinkspace.csu.edu.au/vijay22

 

 

 

 

Week 2:

NAME:  VijayKumar veldi
PROJECT TITLE: Food System and Food Chain supervision using Block Chain Technology
WEEK NO: 2 DATE:24/11/19
PLANNING Preparing Abstract from Previous IEEE journals
MILESTONE: PLANNED: ACTUAL: COMMENT:
 

I have successfully selected the Project Topic

Preparing the Abstract properly from the Main source paper  

I have successfully created the Abstract and satisfied the Lecturer

 Preparing according to the template given
ISSUES  There is will be issue but we need patience
DESCRIPTION: DATE:24/11/19 ACTION/RESULTS: FINISHED (Y/N)
 

 

Prpeparing Abstract

 Yes

 

 

Week 3:

NAME:  Vijaykumar Veld
PROJECT TITLE: Food system and Food Chain supervision by using Block chain Technology
WEEK NO:  3 DATE: 01/12/19
PLANNING Preparing a Project proposal and Proposal plan
MILESTONE: PLANNED: ACTUAL: COMMENT:
 Preparing project proposal and plan

 

 

In this project planning and plan explains the path of the research  This will help to guide the reasearch
ISSUES  This Initial point of the project
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
 Main starting point of the project

 

 

 01/12/19  No

 

 

 

 

 

 

 

 

Week 4:

NAME:  Vijaykumar Veldi
PROJECT TITLE: Food System and Food Chain Supervision by using Block chain Technology
WEEK NO:  4 DATE: 08/12/19
PLANNING Preparing the Initial point of the Project
MILESTONE: PLANNED: ACTUAL: COMMENT:
 This is the main of the project

 

 

This is key feature of the project  

This explains the path of the project

 The project will be explained in proper way in the coming week
ISSUES
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
 The project will be initialized in this week

 

 

 N

 

 

 

 

 

 

 

 

Week 5:

NAME:  Vijaykumar Veldi
PROJECT TITLE: Food system and Food Chain supervision Using By block chain Technology
WEEK NO:  5 DATE: 15/12/19
PLANNING Preparing Annotated Bibliography for literature review
MILESTONE: PLANNED: ACTUAL: COMMENT:
 

 

This is task that we have to summary the 12 articles and criticize them a well.

This research will gives us a boostup  We will learn a lot of new things by this task
ISSUES
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
 

This is one of the task of the project

 

  This is main other aspect of the project  N

 

 

 

 

 

 

 

 

Week 6:

NAME:  Vijaykumar Veldi
PROJECT TITLE: Food system and Food Chain supervision Using By block chain Technology
WEEK NO:  6 DATE: 22/12/19
PLANNING Preparing the project by using technology and application
MILESTONE: PLANNED: ACTUAL: COMMENT:
 

 

This week we will discuss about the Technology used in the project

This explains the project is mainly developed by using three different mechanisms  

This Block chain Technology will explains properly in this week

ISSUES
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
 

 

Project development starts here

 No

 

 

 

 

 

 

 

 

Week 7:

NAME:  Vijaykumar Veldi
PROJECT TITLE: Food system and Food Chain supervision Using By block chain Technology
WEEK NO: 7 DATE: 05/01/20
PLANNING Preparing the research writings from journals and papers
MILESTONE: PLANNED: ACTUAL: COMMENT:
 

This research will give the new ideas to the project

 

The project is mainly explained on the basis of block chain here.  

Food system supervision based on Block chain Technology

ISSUES
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
 

 

 

 05/01/20  No

 

 

 

 

 

 

 

 

Week 8:

NAME:  Vijaykumar Veldi
PROJECT TITLE: Food system and Food Chain supervision Using By block chain Technology
WEEK NO:  8 DATE: 12/01/20
PLANNING Communicating the report (preparing the presentation)
MILESTONE: PLANNED: ACTUAL: COMMENT:
 

This week the presentation is prepared

 

This project is mainly works on the food system maintain and supervision  

This will help us to make a presentation

ISSUES  This phase will have a difficult time
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
 

 

 

 12/0120  No

 

 

 

 

 

 

 

 

Week 9:

NAME:  Vijaykumar veldi
PROJECT TITLE: Food system and Food Chain supervision Using By block chain Technology
WEEK NO:  9 DATE: 19/01/20
PLANNING Preparing Architecture and methods
MILESTONE: PLANNED: ACTUAL: COMMENT:
 

This week the architecture of the project is explained

 

The HMDBC architecture is main one of the project  

This will work for the whole process

ISSUES
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
 

 

 

 19/01/20  No

 

 

 

 

 

 

 

 

Week 10:

NAME:  Vijaykumar Veldi
PROJECT TITLE: Food system and Food Chain supervision Using By block chain Technology
WEEK NO:  10 DATE: 26/01/20
PLANNING Preparing the final report
MILESTONE: PLANNED: ACTUAL: COMMENT:
 

 

This week the final report will be framed and written

This project is explained properly and framed in the correct way
ISSUES
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
 

 

 

 26/01/20   The project final report is framed  Yes

 

 

 

 

 

 

 

 

Week 11:

NAME:  Vijaykumar Veldi
PROJECT TITLE: Food system and Food Chain supervision Using By block chain Technology
WEEK NO:  11 DATE: 02/02/20
PLANNING Revising the whole Project and final report
MILESTONE: PLANNED: ACTUAL: COMMENT:
 

This week will revise the project and final report

 

This week the project will be rechecked and reviewed in proper manner
ISSUES
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
 

 

 

 02/02/20

 

 

 

 

 

 

 

 

Week 12:

NAME:  Vijaykumar veldi
PROJECT TITLE: Food system and Food Chain supervision Using By block chain Technology
WEEK NO:  12 DATE: 09/02/20
PLANNING Preparing the report and Project Presentation
MILESTONE: PLANNED: ACTUAL: COMMENT:
 

 

This week the project report and Project presentation is explained properly

This week is main crucial aspect of the project  

The project is successfully completed

ISSUES
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
 

 

 

 09/02/20   The project is completed sucessfully  Yes

 

 

 

 

Abstract and Project Title

ITC571 – Project Title and Abstract

 

 

 

Full Name Vijaykumar.Veldi
Student ID 11683295
Subject ITC571 – Emerging Technology and Innovations
Assignment No Project Title and Abstract
Due Date 29-November-2019
Lecturer’s Name Malka N. Halgamuge

 

 

Project Title

 

Block chain for Cyber security

This research recognizes peer-explored writing that looks to use blockchain for digital security purposes and exhibits an orderly investigation of the most habitually received blockchain security applications. my findings show that the Internet of Things (IoT) loans itself well to novel blockchain applications, as do systems and machine perception, open key cryptography, web applications, confirmation plans and the protected stockpiling of Personally Identifiable Information (PII).

 

Abstract

 

Project Problem Domain:       The aim of this Research is to give an extensive outline of security affirmation prerequisites and practices in present day SoC structures. Existing writing prominently needs such an inclusion on SoC security, explicitly in materials identified with mechanical practices. We talk about the SoC structure lifecycle, recognize the security concerns handled at each stage, and the difficulties associated with tending to them, which incorporate specialized deterrents (e.g., adaptability of examination), just as holes in procedure and inventory network (e.g., inaccessibility of detail, interface, and foe models, late or surrey outsider IP squares). We talk about momentum modern practices, call attention to their insufficiencies, and present outcomes from some rising examination that give promising bearings.

 

 

 

Background/Context/Description:

This project is about the discovering the resolutions for the power attacks and security for the data storage and transfer and safety about the information of the security information.

 

 

Project Aim/Objectives:

 

The aim of the project is to know about the better ways and security purposes to develop the block chain techniques today outgoing and out sourcing industries

 

Deliverables/Outcomes:

 

The out come of the research is to develop a perfect way to protect the data and data transfer

 

The perfect result of the project will be a secure coding to protect the information that is made by block chain in different industries

 

Resources:

https://ieeexplore-ieee-org.ezproxy.csu.edu.au/document/8649750/references#references

https://ieeexplore-ieee-org.ezproxy.csu.edu.au/document/8649750

https://ieeexplore.ieee.org/document/8048633

 

 

REFERENCES

 

. S. Nakamoto, Bitcoin: A Peer-to-Peer Electronic Cash System, 2008, [online]

  1. Fox-Brewster, Voodoo Hackers: Stealing Secrets from Snowden’s Favorite OS Is Easier Than you Think, [online] Available

 

  1. Kallenberg, X. Kovah, “How many million BIOSes would you like to infect?”, Proc. 15th Annu. CanSecWest Conf. (CanSecWest), 2015

 

  1. Jeschke, C. Brecher, T. Meisen, D. Ozdemir, T. Eschert, “Industrial internet of things and cyber manufacturing systems”, Ind. Internet Things., pp. 3-19, 2017.

 

 

  1. Loucaides, A. Furtak, “A new class of vulnerability in SMI handlers of BIOS/UEFI firmware”, Proc. 15th Annu. CanSecWest Conf. (CanSecWest), 2015.

 

Week 12 Report

ITC571 – WEEKLY PROGRESS REPORT

ID: 11683295 NAME: Vijaykumar.Veldi  
PROJECT TITLE: E-solutions in E-commerce online shopping website
WEEK NO: week 12 DATE:14/10/2019  
PLANNING: Submit Final Report & Demonstrate with Presentation
MILESTONE: PLANNED: ACTUAL: COMMENT:
Submit Final Report & Demonstrate with Presentation
  • Submit Final Report and Demonstrate from Presentation slides.

 

 

Submitted Final Report and Presentation Slides and about to demonstrate. All done and waiting to demonstrate.
ISSUES: Revising the Project and will be summited Shortly
DESCRITPION: DATE: ACTION/RESULTS: FINISHED (Y/N)
Demonstrate with Presentation 14/10/2019 Final Report has been submitted and prepared to demonstrate . Y

 

Week11 report

ITC571 – WEEKLY PROGRESS REPORT

ID: 11683295 NAME: Vijaykumar.Veldi  
PROJECT TITLE: E-solutions in E-commerce online shopping website
WEEK NO: week 11 DATE:07/10/2019  
PLANNING: Submit Final Report & Demonstrate with Presentation
MILESTONE: PLANNED: ACTUAL: COMMENT:
Submit Final Report & Demonstrate with Presentation
  • Final Report written and finalize before submission.

 

 

Worked on the final report making some changes. Few changes before submission.
ISSUES: Few changes before submission
DESCRITPION: DATE: ACTION/RESULTS: FINISHED (Y/N)
Project Closure and Submission 07/10/2019 Made changes to finalize submission. Y

 

Week 10 report

ITC571 – WEEKLY PROGRESS REPORT

ID: 11683295 NAME: Vijaykumar.Veldi  
PROJECT TITLE: E-solutions in E-commerce online shopping website
WEEK NO: week 10 DATE:30/09/2019  
PLANNING: Final report presentation
MILESTONE: PLANNED: ACTUAL: COMMENT:
To prepare a Final Report with Conclusions ·       Preparing the Assessment Task Final report Google research has been done and a few examples had been discovered and statistics is gathered. Application oriented topic and still research is going on.
ISSUES: There are so many aspects to conclude
DESCRITPION: DATE: ACTION/RESULTS: FINISHED (Y/N)
Final Report Preparation 30/09/2019 Worked on methods and material involved for Web developing technologies. Y

 

week 9 report

ITC571 – WEEKLY PROGRESS REPORT

ID: 11683295 NAME: Vijaykumar.Veldi  
PROJECT TITLE: E-solutions in E-commerce online shopping website
WEEK NO: week 9 DATE:23/09/2019  
PLANNING: Communicating a report( preparing  a presentation)
MILESTONE: PLANNED: ACTUAL: COMMENT:
Preparing a presentation
  • Analyze Methods and Materials required for E solutions from research papers.

·       Provide examples of most important assets of statistics to be had on E commerce internet site.

Google research has been done and a few examples had been discovered and statistics is gathered. Application oriented topic and still research is going on.
ISSUES: Application is costly and efficient
DESCRITPION: DATE: ACTION/RESULTS: FINISHED (Y/N)
Preparing a presentation 23/09/2019 Worked on methods and material involved for Web developing technologies. Y

 

week 8 report

 

ITC571 – WEEKLY PROGRESS REPORT

ID: 11683295 NAME: Vijaykumar.Veldi  
PROJECT TITLE: E-solutions in E-commerce online shopping website
WEEK NO: week 8 DATE:16/09/2019  
PLANNING: Communicating a report( preparing  a presentation)
MILESTONE: PLANNED: ACTUAL: COMMENT:
 Research writing for A4 Task 1 .
  • Analyze Methods and Materials required for E solutions from research papers.

·       Provide examples of most important assets of statistics to be had on E commerce internet site.

Google research has been done and a few examples had been discovered and statistics is gathered. Application oriented topic and still research is going on.
ISSUES:
DESCRITPION: DATE: ACTION/RESULTS: FINISHED (Y/N)
Research writing for A4 Task 1 . 16/09/2019 Worked on methods and material involved for Web developing technologies. Y

 

week 7 report

ITC571 – WEEKLY PROGRESS REPORT

ID: 11683295 NAME: Vijaykumar.Veldi  
PROJECT TITLE: E-solutions in E-commerce online shopping website
WEEK NO: week 7 DATE:09/09/2019  
PLANNING: Research Writing
MILESTONE: PLANNED: ACTUAL: COMMENT:
 Research writing for A4 Task 1 .
  • Analyze Methods and Materials required for E solutions from research papers.

·       Provide examples of most important assets of statistics to be had on E commerce internet site.

Google research has been done and a few examples had been discovered and statistics is gathered. Application oriented topic and still research is going on.
ISSUES:
DESCRITPION: DATE: ACTION/RESULTS: FINISHED (Y/N)
Research writing for A4 Task 1 . 19/08/2019 Worked on methods and material involved for Web developing technologies. Y

 

week 6 report

ITC571 – WEEKLY PROGRESS REPORT

ID: 11683295 NAME: Vijaykumar.Veldi  
PROJECT TITLE: E-solutions in E-commerce online shopping website
WEEK NO: 6 DATE:26/08/2019  
PLANNING:
MILESTONE: PLANNED: ACTUAL: COMMENT:
Reviewing Literature

 

26/08/2019 to 1/09/2019 26/08/2019 to 01/09/2019 This week’s task was to read different research papers for the future work on the project of the of the E solutions in framing and redevelop the coding
ISSUES: There a  lot of confusion by researching the a lot of articles
DESCRITPION: DATE: ACTION/RESULTS: FINISHED (Y/N)
This become a brand new thing to me so I wasted a number of time in studying the magazine articles. It turned into also difficult for me because I had a touch expertise of the difference between research paper and journal article. 28/08/2019 I searched a lot of  research papers and some selected  few papers with help of my friend  

 

week 5 report

WEEk5 :PREPARING ANNOTATED BIBLIOGRAPHY FOR LITERATURE REVIEW AND SYNOPSIS FOR JOURNAL ENTRY

 

ITC571 – WEEKLY PROGRESS REPORT

ID: 11683295 NAME: Vijaykumar.Veldi  
PROJECT TITLE: E-solutions in E-commerce online shopping website
WEEK NO: week 5 DATE:19/08/2019  
PLANNING: Preparing Annotated Bibliography for literature review
MILESTONE: PLANNED: ACTUAL: COMMENT:
To prepare annotated bibliography and preparing Journal synopsis.
  • Demonstrate the research you have performed on E solution in ecommerce website.
  • Provide examples of major sources of information available on E solutions e commerce website.

 

Google research has been done and a few examples were observed and information is collected. Application oriented topic and still research is going on.
Step 1 of 2
Please sign in first
You are on your way to create a site.