week 12 final report

 

NAME: Jasmeet singh baidwan (11699673)
PROJECT TITLE: IoT in Farming
WEEK NO:  12 DATE:12/10/2020
PLANNING Report is submitted after completion of the changes staff suggested to do in report.
MILESTONE: PLANNED: ACTUAL: COMMENT:
 

The report is generated and the project report is delivered as suggested by the staff.

The completion of the report and making the necessary changes for submission. The project is submitted after the changes are made in the report.  Report submission after verification of staff.
ISSUES  NO
DESCRIPTION: DATE:12/10/2020 ACTION/RESULTS: FINISHED (Y/N)
The changes suggested by the staff in the previous week report submission are corrected and submitting to the staff.

 

  The report is submitted to the staff for the final results of the report are generated.  YES

 

week 11 report

 

NAME:  Jasmeet singh baidwan
PROJECT TITLE: IoT in farming
WEEK NO:  11 DATE: 04/10/2020
PLANNING
MILESTONE: PLANNED: ACTUAL: COMMENT:
Reassessing the research manifesto Evaluating the report thoroughly before its submission The research report was analyzed carefully before presenting it The research work is completed
ISSUES
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
None Y

week 10 report

 

NAME:  Jasmeet singh baidwan 
PROJECT TITLE: IoT in farming
WEEK NO:  10 DATE: 27/09/2020
PLANNING
MILESTONE: PLANNED: ACTUAL: COMMENT:
Heading with the proposed solution Noted down the research outcomes All the important areas of the research work and its results are presented in this week Collected the research output
ISSUES
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
None Y

 

week 9 report

 

NAME:  Jasmeet singh baidwan
PROJECT TITLE: IoT in farming
WEEK NO:  9 DATE: 21/09/2020
PLANNING
MILESTONE: PLANNED: ACTUAL: COMMENT:
Describe all the main key points in article Present the results which brings from the problems Written down all points in the article.
ISSUES
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
Evaluate the results and present it. Analyzed the different articles to get the effective result.  Y

 

WEEK 8 REPORT

 

NAME:  Jasmeet singh baidwan
PROJECT TITLE: IoT IN FARMING
WEEK NO:  8 DATE: 25/09/2020
PLANNING Literature Review
MILESTONE: PLANNED: ACTUAL: COMMENT:
Conduct a preliminary literature review pertaining to articles selected for research work. Thoroughly assess all potential articles to ensure that appropriate learning outcomes are obtained. Critically traverse through different articles for obtaining any potential information that could be useful for the undertaken research work. Learned about some interesting elements which could be useful in practically deploying the solutions of the proposed project.
ISSUES
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
I did not know a particular format that can be used for optimally conducting a literature review to thoroughly understand important information present in research articles. 25/09/2020 I went online to learn and understand the basic parameters that must be kept into consideration while conducting such reviews. This helped to initiate the literature review and work with efficacy. Yes

 

week 7 week

 

NAME: Jasmeet singh baidwan
PROJECT TITLE: IoT IN FARMING
WEEK NO:  7 DATE: 16/09/2020
PLANNING Improvement of Conceptual Framework
MILESTONE: PLANNED: ACTUAL: COMMENT:
Obtain information from research papers to improve the efficacy of the proposed conceptual framework. Skim and scan through selected research articles to extract optimal information to facilitate conceptual framework. Obtained appropriate information that aided in improving the working mechanism for the research framework. I was able to critically understand several essential parameters that could be integrated into the proposed framework.
ISSUES
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
I was not quite sure of what relevant improvements could be made in the framework to ensure that it works with efficacy when practically implemented in a real-life environment. 16/09/2020 I collaborated with my colleagues and obtained feedback from them regarding the proposed solutions. I was able to understand and visualize the overall scope of improvement with efficacy. Yes

 

week 6 report

 

NAME:  Jasmeet singh baidwan
PROJECT TITLE: IoT in farming
WEEK NO:  6 DATE: 09/09/2020
PLANNING Conceptual Framework
MILESTONE: PLANNED: ACTUAL: COMMENT:
Develop a rough conceptual framework for the undertaken project. Perform intensive research to obtain relevant information and formulate a framework that could be utilized for project development. I thoroughly assessed different research articles and ensured that appropriate information can be fetched. Learned about some interesting elements which could be useful in practically deploying the solutions of the proposed project.
ISSUES
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
I faced critical difficulty in finalizing how different emerging technologies can be fitted into one single platform to operate as a singular system. 09/09/2020 By obtaining help from colleagues and researching on the internet, I gathered substantial information that facilitated the process of conceptual framework development.

 

week 5 report

Name jasmeet singh baidwan
Student Id 11699673
week 5
Project Title internet of things in farming
Planning By studying ten research papers i am going to plan what are the applications of my technology and also where these technologies are used in the industries.
Description and Action After studying i am going to make a framework where i am going to explain what are the issues, what are the challenges with regard of privacy, security, and different types of threat.

 

week 4 report

Name Jasmeet singh baidwan
Project title internet of things in farming
Week number 4 Date 20/08/2020
Planning
Milestone Planned Actual Comment
Identification of pros and cons of autonomous vehicle technology The week is dedicated to understanding the pros and cons of autonomous vehicle technology Articles and journals relevant to the field of study were studied to understand the pros and cons. The number of impact advantages is more than disadvantages.
Issues
Description Date Action/ results Finished
Although there are so many technologies exist in the market with some disadvantages, we can make this technology great. 20/08/2020 The research of this week has helped understand the present situation and some future of the technology Yes

week 3 report

NAME: jasmeet singh baidwan (11699673)
PROJECT TITLE: Internet of Things in Farming
WEEK NO:  3 DATE: 09/08/2020
PLANNING Reading articles.
MILESTONE: PLANNED: ACTUAL: COMMENT:
Identifying all the issues, which put negative impacts on the fields. Analyzing the problems and find some of the solutions. Select the final topic for the research .  complete the project research.
ISSUES  Collect the project problems and implementing the solutions.
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
Need more time for the research project and find some correct information..

 

 09/08/2020  Finalizing the research.  

        Y