WEEK12

Week 12:

NAME:  Gorantla Prashanth Kumar
PROJECT TITLE: 5G Network Connectivity, Speed and Reliability: Improving the Energy Sector Infrastructure with Smart Power Grid
WEEK NO: 12 DATE: 05/02/21
 
PLANNING Project closure is being planned in this week.
MILESTONE: PLANNED: ACTUAL: COMMENT:
The last phase of the project is the project closure that would hand over the deliverables. The change request being made would deploy the change management. The deliverables would be handled to the customers. No
ISSUES Certain challenges were found in collecting feedbacks.
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
The project quality would be known by the feedbacks collected from the customers. The document would be passed to the clients, suppliers and so on. Yes.

 

 

 

WEEK 11

Week 11:

NAME:  Gorantla Prashanth Kumar
PROJECT TITLE: 5G Network Connectivity, Speed and Reliability: Improving the Energy Sector Infrastructure with Smart Power Grid
WEEK NO: 11 DATE: 3/02/21
 
PLANNING Project deployment would be done in this phase.
MILESTONE: PLANNED: ACTUAL: COMMENT:
According to the work plan being implemented, the project would be deployed. Based on the planned timespan and preliminaries the deployment would be planned. Deployment steps would comprise text build, coding, planning and monitoring. No
ISSUES Need of minimizing the changes.
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
Steps that comprise of actions would be deployed based on the duration. The project would be deployed by creating the release of the software. Yes.

 

 

WEEK10

Week 10:

NAME: Gorantla Prashanth Kumar
PROJECT TITLE: 5G Network Connectivity, Speed and Reliability: Improving the Energy Sector Infrastructure with Smart Power Grid
WEEK NO: 10 DATE: 31/01/21
 
PLANNING Certain plans were established to monitor and control the schedule.
MILESTONE: PLANNED: ACTUAL: COMMENT:
The monitoring process is being performed throughout the project and ensures the results. Planned according to the deployment of change management. Controlling the schedule would comprise progress reporting, performance and the variance. No
ISSUES Concerns would arise in the change management process.
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
The proper use of change management would result in the minimization of complexities. As per the change request, the change management would be implemented.  Yes

 

WEEK9

Week 9:

NAME:  Gorantla Prashanth Kumar
PROJECT TITLE: 5G Network Connectivity, Speed and Reliability: Improving the Energy Sector Infrastructure with Smart Power Grid
WEEK NO: 9 DATE: 24/01/2020
 
PLANNING The workflow was being planned.
MILESTONE: PLANNED: ACTUAL: COMMENT:
 The workflow is to be created by taking into the consideration of whole phases that are involved in the project. Each phase is being planned accordingly and each of the stakeholder is being assigned to it. Splitting up of tasks made the project scope to be outlined easier. No
ISSUES   It was found complex to split the tasks according to the priority.
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
 A deep review was made so that the tasks were scheduled according to the ease of access.

 

  The scheduled phases were appropriate for the members involved in the project. Yes.

 

week8

Week 8:

NAME:  Gorantla Prashanth Kumar
PROJECT TITLE: 5G Network Connectivity, Speed and Reliability: Improving the Energy Sector Infrastructure with Smart Power Grid
WEEK NO: 8 DATE: 17/01/2021
 
PLANNING Planning was made to obtain the requirement document approval.
MILESTONE: PLANNED: ACTUAL: COMMENT:
The project sponsor must offer the approval after making an analysis on the requirement documentations provided. Before submitting for approval, it was planned to recheck the documents. Risks that were identified were resolved and then submitted for approval. No
ISSUES No issue.
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)

 

 

WEEK7

Week 7:

NAME:  Gorantla Prashanth Kumar
PROJECT TITLE: 5G Network Connectivity, Speed and Reliability: Improving the Energy Sector Infrastructure with Smart Power Grid
WEEK NO: 7 DATE: 10/01/2021
 
PLANNING In this phase, it is being planned to validate the business requirement documents.
MILESTONE: PLANNED: ACTUAL: COMMENT:
In the planning phase, the business analyst must develop a requirement work plan that contains a detailed schedule, cost and resources of the project. The project plan would be circulated among all the stakeholders. The verification and validation is being completed. No
ISSUES There was certain delays made to validate.
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
Due to the lack of time, the team could not validate it at the assigned time.   Anyhow the team had completed the validation of the project successfully.  Yes

 

WEEK6

Week 6:

NAME:  Gorantla Prashanth Kumar
PROJECT TITLE: 5G Network Connectivity, Speed and Reliability: Improving the Energy Sector Infrastructure with Smart Power Grid
WEEK NO: 6 DATE: 3/01/2021
 
PLANNING The project is being developed with the collection of various requirements.
MILESTONE: PLANNED: ACTUAL: COMMENT:
 The tasks that were being split would be developed into individual modules. The development phase would rely on the scope, goals and the deliverables of the project. A detailed decomposition of work being planned is created. No
ISSUES Difficult to identify the manageable components.
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
The manageable components are those that supports the development of the project work.   An effective project is being developed that ought to be launched as well.  Yes

 

 

WEEK5

Week 5:

NAME:  Gorantla Prashanth Kumar
PROJECT TITLE: 5G Network Connectivity, Speed and Reliability: Improving the Energy Sector Infrastructure with Smart Power Grid
WEEK NO: 5 DATE: 27/12/20
 
PLANNING The project was being designed with the authorities.
MILESTONE: PLANNED: ACTUAL: COMMENT:
 The project milestone was to establish an infrastructure that would offer a high speed, connectivity and reliability. It was planned to implement the fastest network so as to improve the infrastructure. Latest technologies were taken into consideration as it offers accuracy. No
ISSUES   No issues being found.
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
 –

 

 

 

week4

Week 4:

NAME:  Gorantla Prashanth Kumar
PROJECT TITLE: 5G Network Connectivity, Speed and Reliability: Improving the Energy Sector Infrastructure with Smart Power Grid
WEEK NO: 4 DATE: 20/12/20
 
PLANNING Plan was established to estimate the duration of each activities.
MILESTONE: PLANNED: ACTUAL: COMMENT:
The milestone was to analyze about how long a task would take time to accomplish the activities. Estimation methods were being planned to analyze the duration. Three point estimation was being used as a tool for measure the duration taken by the tasks. No
ISSUES There arouse a confusion of which technique to be used.
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
The technique must be chosen according to the accuracy it offers. Pessimistic estimation was found to be good. Yes

 

 

 

 

 

WEEK3

Week 3:

NAME:  Gorantla Prashanth Kumar
PROJECT TITLE: 5G Network Connectivity, Speed and Reliability: Improving the Energy Sector Infrastructure with Smart Power Grid
WEEK NO: 3 DATE: 13/12/2021
 
PLANNING The project would be initiated which is being planned in this third week.
MILESTONE: PLANNED: ACTUAL: COMMENT:
 A list of requirements to be collected and applied were scheduled. Project initiation was planned that would include the scope definition, methods and the deliverables. Initiation along with the creation of project schedule being made. No
ISSUES  It is difficult to predict the project schedule and cost in prior.
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
 Various analysis was being done to choose appropriate schedule and cost for the project.

 

  The evaluation for the project schedule was completed with the creation of use cases.  Yes

 

 

Step 1 of 2
Please sign in first
You are on your way to create a site.