week12

Week 12:

NAME:
PROJECT TITLE: Cryptography in Big data and IoT
WEEK NO:  12 DATE: 24-05-2019
PLANNING End closure for the report.
MILESTONE: PLANNED: ACTUAL: COMMENT:
 To conduct a quality check for the overall report before the enclosure.

 

 

Discussion is made among the team members and it is decided to check the closure list for the report before delivery. Based on the discussion made in the meeting the checking the enclosure list is under progress.  No comments
ISSUES  No issues
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
 To look after the enclosure list in the meetings by providing possible ideas to implement in the report. The action is made through analyzing the overall enclosure list implementing for the report.  Yes

 

week11

Week 11:

NAME:  
PROJECT TITLE: Cryptography in Big data and IoT
WEEK NO:  11 DATE: 17-05-2019
 
PLANNING Overall analysis on the report.
MILESTONE: PLANNED: ACTUAL: COMMENT:
 The work to be done is to conduct an overall analysis throughout the report to detect the lack of content.

 

 

The meeting is made along with the members and decided that the overall analysis must be done. The overall report is analyzed and reviewed by the members and it is ready for quality check.  No comments
ISSUES  No issues.
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
 The overall analysis is done by analyzing the content in the report, whether it is necessary or wanted to be added.    The action is taken that overall report is analyzed and it is sending for the quality check.  Yes

week10

Week 10:

NAME:  
PROJECT TITLE: Cryptography in Big data and IoT
WEEK NO:  10 DATE: 10-05-2019
 
PLANNING Discussion were done regarding the future research.
MILESTONE: PLANNED: ACTUAL: COMMENT:
 The research work of several authors can be used to make it better secured in the future. The IOT and big data issues in the current work and how it was managed was discussed. The conclusions of several authors are recommended for further research.  No comments
ISSUES  Discussion was long as several authors conclusion was added.
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
 The discussion about authors research will help for practical applications.

 

 

  The recommendations will help to conduct the test on real devices .  Yes

 

 

week9

Week 9:

NAME:  
PROJECT TITLE: Cryptography in Big data and IoT
WEEK NO:  9 DATE: 03-05-2019
 
PLANNING Setting up the work breakdown structure for the report.
MILESTONE: PLANNED: ACTUAL: COMMENT:
 The work to be done is to setting up the proper work breakdown structure for the report.

 

 

The discussion is made among the members on setting up the efficient work break down structure.  The WBS is set based on the topic requirements and it is ready to be implemented.  No comments
ISSUES  Issue over planning the WBS setting.
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
 Confusion over setting the structure of the WBS among the members.

 

 

   Proper research is made among the members through online and suitable WBS is implemented in the report.  Yes

 

week8

Week 8:

NAME:  
PROJECT TITLE: Cryptography in Big data and IoT
WEEK NO:  8 DATE: 26-04-2019
 
PLANNING Browsed and searched on ethical issues related with topic.
MILESTONE: PLANNED: ACTUAL: COMMENT:
 The work is to be done on providing the right control over the ethical issues related to the topic in this report.

 

 

The discussion is made among the members to solve the ethical issues arise on the topic.  The ethical issues related with the topic are searched ad browsed through online.  No comments
ISSUES  Identifying appropriate ethical issues.
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
 Confusion on identifying the main ethical issues arises relevant to the topic.

 

 

   Proper studies are made on the ethical issues and suitable solutions are implemented in the report.  yes

 

 

 

 

week7

NAME:  
PROJECT TITLE: Cryptography in Big data and IoT
WEEK NO:  7 DATE: 19-04-2019
 
PLANNING Collecting system design methods.
MILESTONE: PLANNED: ACTUAL: COMMENT:
 The work must to be done is collecting the system designing methods related to the topic.

 

 

The meeting is conducted among the members and discussed about proper collecting methods for system design. Collected the system design methods based on the related topic and it is ready to implement in the report.  No comments
ISSUES  Improper selection of system design methods.
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
 Wrong selection of

Designing methods for system will affect the nature of the report.

 

   Proper suggestions and discussion made among members and through online and implemented in the report.  Yes

 

 

 

week6

Week 6:

NAME:  
PROJECT TITLE: Cryptography in Big data and IoT
WEEK NO:  6 DATE: 12-04-2019
 
PLANNING Data collection was done regarding the topic.
MILESTONE: PLANNED: ACTUAL: COMMENT:
 Data collection was done to take decisions on how to protect the data.

 

 

Smart city data, E-health application data were planned to use for this purpose. The data from power consuming devices and sensors are used for analysis.  No comments
ISSUES  It had some difficulty in collecting large amount of data.
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
 Data collection will help to solve the security issues faced in IOT.

 

 

   The collected data helped to know how the attacks occur and helped to provide a solution.  Yes

 

week5

 

Week 5:

NAME:  
PROJECT TITLE: Cryptography in Big data and IoT
WEEK NO:  5 DATE: 05-04-2019
 
PLANNING Method of writing the content in introduction.
MILESTONE: PLANNED: ACTUAL: COMMENT:
 Effective way of writing the content for introduction in the report.

 

 

Meeting held among the team members and suitable way of writing the introduction content is discussed. The content required for the introduction is collected and it is ready to be implemented.  No comments
ISSUES  Confusion on writing important content for introduction.
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
 Issues occur on which type of content must be added on introduction part of the report.

 

 

   Effective search is made on adding the content over the introduction part which is included in the report.  Yes

week 4

Week 4:

NAME:  
PROJECT TITLE: Cryptography in Big data and IoT
WEEK NO:  4 DATE: 29-03-2019
 
PLANNING Collecting Reference related materials for the report.
MILESTONE: PLANNED: ACTUAL: COMMENT:
 The work must be done is collecting the IEEE standard papers which should be implemented in the reference part.

 

 

The discussion is made over the selecting the standard IEEE papers through online. Based on the conducted discussion IEEE papers are collected to implement in the report.  No comments
ISSUES  Issues on implementing the standard papers in the report
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
 Confusion arises on proper identifying of the standard reference PDF.

 

 

   According to the appropriate topic, the selection and suggestion is taken on online and suitable reference is implemented in the report.  Yes

week 3

Week 3:

NAME:  
PROJECT TITLE: Cryptography in Big data and IoT
WEEK NO:  3 DATE:  22-03-2019
 
PLANNING Browsing of related figures related to the topic.
MILESTONE: PLANNED: ACTUAL: COMMENT:
 The work to be done is to find the appropriate figure for the report related to the selected topic.

 

 

The plan is made on selecting the figure through online and other sources. Based on the plan made the figures for the particular report is collected and ready to add in the report.  No comments
ISSUES  Slight confusion in choosing figures.
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
 Issues arise on choosing the appropriate figures for the related content over the report.

 

 

   Effective search is made on online for selecting the appropriate figure and it Is successfully added in the report.  Yes